Location: Ramat Hovav, Israel

Year Completed: 2014

Scope of Works

  • Complete Mechanical Construction

  • Supply of Manpower & Expert for Mechanical Assembly

  • Supply of equipment, tools, cranes  and machinery 

  • Installation of Mechanical equipment,  Siemens STG & GE GTG Turbines

  • Complete assembly including P11/22 Piping, Steel structure 

  • HRSG Erection and ACC’s Erection

Description

The complete construction of this 110MW Cogeneration Power Plants is simultaneously with the other power plant located in Ashdod under M+W Group. It was completed in 2014 and the final client is Edeltech Group Israel. It situated in the middle of the industrial Park in Ramat Hovav.