Projects / Power Plants / Beer Tuvia 451MW

Location: Beer Tuvia, Israel

Year Completed: 2020

Scope of Works

  • Design, Fabrication, Supply and Installation of Storage Tanks

  • Supply of Manpower & Expert for Mechanical Assembly

  • Steel Structure and Cladding Works 

  • Fabrication and Erection of  HRSG

  • Fabrication, Supply and Erection of ACC’s 

Description

The construction of 451MW IPM Beer Tuvia Power plant is consider to be one of an essential national infrastructure projects, which is taking a significant part in Israel’s continuing energy revolution, creating a competitive market that will produce cheaper and cleaner electricity. The power plant will be fueled by Israeli natural gas to be bought from the Leviathan and Tamar reservoirs. It is anticipated to produce and supply electricity by the end of 2020. It will supply 3.5% of Israel's electricity needs, and produce power at 60% efficiency, which will make it the most efficient power plant in Israel. The electricity will be sold to end-user clients and to the IEC (Israel Electric Corporation), with tariffs cheaper than average market prices. The power plant is located in Be’er Tuvia Industrial Zone, 60 km from Jerusalem. The Beer Tuvia power plant project is constructed under contract with Siemens and the end client is Israel Power Management (IPM).

  • Facebook Social Icon

Copyright © 2018 by ISA KHOURY LTD. All right reserved.