Scope of Works

  • Fabrication and Erection of Pressure Vessels under ASME Code Standard

  • Fabrication and Installation of Steam and BOP piping works

  • Installation of Pipe racks and different structures

  • By-pass & Main Stack for Boilers

  • Erection of 2 units of Fuel Storage tanks 12,500 cum each

Description

140MW CCPP is the first and largest Power Plant ever constructed in Gaza under Alstom Power Generation, Sweden. The power plant is owned and under the mangament of Palestinian Electric Company. Despite of the issue of national security and political situation between Israel and Gaza, ISA KHOURY team successfully executed and constructed the project on time. Mobilization of manpower and equipment on site and crossing the boarder is not an issue at all since we have a subsidiary office in area.